Corrective analysis of transient instabilities for PMU in the Peruvian Center-South Transmission System

Cesar Diaz, Ricardo Arias, Julien Noel

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

1 Cita (Scopus)

Resumen

Our research proposed a methodology for detecting transient instability failures in dynamic simulations for Peruvian Center-South Transmission System. Our findings are disconnection time up to 190ms for 500 kV in overhead lines, an interrupted power greater than 32 MW and the type of line according to its voltage (500 kV) [1]. The case study is the disconnection of line 5011 (Chilca Nueva-Fenix), which had a replacement time of 4h 14 min and an interrupted power of 529.6 MW; obtaining a critical angle of 1.26 rad and a time saving of 4.75 s.

Idioma originalInglés
Título de la publicación alojada2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2021
EditorialInstitute of Electrical and Electronics Engineers Inc.
ISBN (versión digital)9781665444217
DOI
EstadoPublicada - 15 set. 2021
Evento2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2021 - Lima, Perú
Duración: 15 set. 202117 set. 2021

Serie de la publicación

Nombre2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2021

Conferencia

Conferencia2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2021
País/TerritorioPerú
CiudadLima
Período15/09/2117/09/21

Huella

Profundice en los temas de investigación de 'Corrective analysis of transient instabilities for PMU in the Peruvian Center-South Transmission System'. En conjunto forman una huella única.

Citar esto